✓ All systems nominal
Secure zone Print Hall 1 · access level L4
Banknote Shopfloor — print hall · secure logistics · top-down live
AGV-D —
Shift — · crew —
On floor — · next break —
Bottleneck B050 Intaglio
Sheet 45 notes · shredder for defects
—/h
Output rate · sheets
—%
Line FPY
—%
OEE
—
Good notes · today
—
Sheets shredded
—
AGV-D material trips
Stations
Running
Loading / idle
Inspection
FaultBlocked — downstream full
AGV-D — real fleet telemetry: vault-escorted deliveries; cargo sprite shows the material on board (paper pallet, ink drums, foil roll, banding crate)
AGV corridor + spur lanes — the AGV only drives marked lanes
Pedestrian walkway
Crew
At the machine
Waiting — machine idle
Intervening — fault / maintenance
Inspecting a reject
On break — off the floor
Dashed ring = roving role. The maintenance tech walks to whatever is down and the inspector to whatever just scrapped; three crews (A/B/C) rotate over the 3×8 calendar, and the vault custodian holds the floor through breaks
Queues
3 slots on each press infeed = sheets waiting on the conveyor (QUEUE_CAPACITY). Amber = full, so the press upstream is blocked and cannot unload — this is how the B050 bottleneck backs the line up
Bins
Lineside bin at each press (AGV-D drop point) — fill level live, red = low → delivery dispatched
Flow
Substrate vault → print row → intaglio row → inspection → cash vault · defects → shredder
Sheet Accountability — every sheet out of the vault, reconciled · today
—
—
Sheets fed · B010
=
—
Cut & banded · B070
+
—
Shredded
+
—
Still on the line
+
—
Unaccounted