Equipment health
—
Production forecast
—
Loading…
Refresh interval: 60 s
Production forecast
——shift target from the active order… …
—/ — units
projected at shift end · band —
Loading forecast…
Built so far—
Pace · rolling 3 h—
Shift—
built
projection · band
target
breaks
cumulative good units · hours into shift
Output tendency
Output tendency
Shift history
—
Shift history
—
Recomputed every 60 s from end-of-line PASS events · pace = rolling 3 h completion rate with quartile band ·
target = active order (Rotor / E-Axle) or planned rate at 80 % OEE · trend refreshed every 5 min · shift counter cross-checked against the transaction archive on every poll
Projected gap = projection − target · required pace = units still to build ÷ productive time left (breaks removed) · recoverability compares that requirement to the rolling pace, to the observed upper pace of the last 3 h and to the takt ceiling — a requirement above the ceiling is reported as not recoverable, never as a target · recommendations restate observed constraints from the forecast risks and the live operations aggregate; this page issues no commands
Projected gap = projection − target · required pace = units still to build ÷ productive time left (breaks removed) · recoverability compares that requirement to the rolling pace, to the observed upper pace of the last 3 h and to the takt ceiling — a requirement above the ceiling is reported as not recoverable, never as a target · recommendations restate observed constraints from the forecast risks and the live operations aggregate; this page issues no commands