The product · built on this line
EESM Wound Rotor
Copper winding + slip rings — externally excited, no magnets
(eATS-2.0 style).
11 stations · serials ROT- · palletized 5 / PAL1- pallet to the assembly buffer.
11 stations · serials ROT- · palletized 5 / PAL1- pallet to the assembly buffer.
—/h
Output rate · rotors
—%
Line FPY
—%
OEE
—
Rotors · today
—
Scrapped · today
—pcs
Lineside @A020
✓ All systems nominal
EESM rotor line · machining → winding & insulation → finish & test · fills the assembly rotor buffer
Shift Forecast · Rotors
—
—
output / h · last 8h
Rotor Shopfloor — EESM wound rotor · live station states
AGV-A —
Shift — · crew —
On floor — · next break —
Bottleneck M040 Varnishing
Lineside @A020 — · target 10–20 (2–4 pal)
Crew on line
— on floor
— working
— intervening
— idle
— on break
Live
Running
Loading / idle
Blocked
Fault
Maintenance
Break
Pallet rack · lineside stock
AGV-A · operators
AGV aisle
Pedestrian walkway
Machining · M010–M025
shaft turned, heat-treated and ground; lamination core stacked and shrink-fitted
the bare rotor body gains its copper
Winding & insulation · M030–M045
copper field winding laid, slip rings contacted, varnish-impregnated, HV-tested
the wound rotor is balanced, marked and validated
Finish & test · M050–M060
balanced to spec, laser-marked with its DMC, final electrical test
finished rotors palletize — AGV-A hauls PAL1- pallets to the assembly hall
Outbound · Pallet rack → lineside stock at A020
good ROT- rotors stack 5 to a PAL1- pallet; sealed pallets wait in the rack until the assembly hall's lineside stock (2–4 pallets beside A020) calls for one — AGV-A hauls it over
PALLET RACK · LINESIDE STOCK @A020 —
Two stages of the same flow: sealed PAL1- pallets in the rack here (upstream of the haul) · delivered pallets being unloaded beside A020 (downstream)
Lineside target 10–20 rotors = 2–4 pallets — the bar below is the stock at A020, not the rack; AGV-A pulls a pallet from the rack when it drops below 10 + one pallet, so pallets accumulate here when assembly slows. At 0 the assembly line starves and waits on M060.
Unit of production = the rotor (serials ROT-). AGV-A both replenishes materials (shafts, laminations, copper wire, slip rings, varnish)
and hauls finished pallets to assembly. States update live from the simulator · OPC-UA opc.tcp://…:4840 · MQTT rotor/#.